Company News Contact Information Language :
Process Engineering Solutions

PIGNAT assist you

Advice to install your unit…

PIGNAT manages the installation of your units in your building: before the installation, dimensions of the access,
location of the unit, fluids and energy requirements are specified for each unit...
Here is an example of a typical layout in a chemical engineering lab.

 

 

 

1- Feedings  2- Drainages

The fluid pipes are affixed to the wall and each pipe is equipped with an isolating valve installed at chest height

ex. steam, water, air, events

in a wall collector

in digged collector

in a gutter

 
 
 
 
 
 
 
 

 

 

 

 

 

 

 

 

 

 

 

 


   
Stand alone heating system :
PIGNAT provides small heaters to ease the installation
in a classic classroom.
Electricity: example of cabinet fixed on a
wall with single & three phase plugs 
Starting and training of the unit: technical people